Permit Solutions

Environment-friendly practices and solutions for your business and organization.

Permit Solutions
We process for facilities the coverage under the Multi-Sector Industrial General Permit and Construction General Permit by submitting a completed application form for Notice of Intent (NOI) To meet the eligibility requirements of the permit is necessary to develop a stormwater pollution prevention plan (SWPPP) and installs and implements control measures (BMP). You must need to submit one NOI for each facility or construction site.
Plans Solutions
We designed The SWP3 is a plan that we elaborate for your facility that methodically evaluates potential pollutant sources and describes specific Best Management Practices (BMP's) that your facility will implement to minimize and control pollutants that may be discharged in storm water runoff. The SWP3 is a living document that will record the progress as conditions change at the facility as a result of following the BMP.
Permits and Plans
• Notice of Intent (NOI)
• No Exposure Certification (NEI)
• Notice of Termination
• SWPPP
• Site Inspections
• Benchmark Monitoring Sampling
• Data -Lab Testing Discharge
• Monitoring Reports
• Structural- Non Structural Controls

Basic Requirements of SWPPP

We process the No Exposure Certification (NEC) if in your facility all industrial materials or activities are located indoors or protected by a storm resistant shelter to prevent exposure to rain, snow, snow melt and/or runoff.